Plumbing Plans (P-Series)

Example

Basic Example: Pipe Slopes A 100mm100\text{mm} sanitary pipe runs 15m15\text{m} at 2%2\% slope. Stack invert is 10.000m10.000\text{m}. Find start invert.

Step-by-Step Solution

0 of 2 Steps Completed
1

Example

Intermediate Example: Vent Stacks A dashed line connects a trap to a vertical pipe going through the roof.

Step-by-Step Solution

0 of 2 Steps Completed
1

Example

Advanced Example: Water Supply Fixture Units (WSFU) A bathroom has a flush valve WC (10 WSFU), a lavatory (2 WSFU), and a shower (2 WSFU).

Step-by-Step Solution

0 of 2 Steps Completed
1

Electrical Plans (E-Series)

Example

Basic Example: Wiring Layouts 3 lights connected by solid lines, a dashed line with an arrow, and a switch S3S_3.

Step-by-Step Solution

0 of 3 Steps Completed
1

Example

Intermediate Example: Panel Schedules A circuit is labeled 20A, 1-pole. The load is 1800W1800\text{W} at 120V120\text{V}.

Step-by-Step Solution

0 of 2 Steps Completed
1

Example

Advanced Example: Voltage Drop A 120V circuit runs 150ft150\text{ft} to a 12A12\text{A} load. Max allowable drop is 3%3\%.

Step-by-Step Solution

0 of 2 Steps Completed
1

Mechanical Plans (M-Series)

Example

Basic Example: HVAC Airflow A main duct is 800×400mm800 \times 400\text{mm}. Velocity is 5.0m/s5.0\text{m/s}. Find QQ (m3/sm^3/s).

Step-by-Step Solution

0 of 2 Steps Completed
1

Example

Intermediate Example: Duct Reductions A duct reduces from 800×400800\times400 to 600×400600\times400 after a branch takeoff.

Step-by-Step Solution

0 of 2 Steps Completed
1

Example

Advanced Example: Return Air Plenums No return ducts are drawn in an office with a drop ceiling.

Step-by-Step Solution

0 of 2 Steps Completed
1