Plumbing Plans (P-Series)
Example
Basic Example: Pipe Slopes A sanitary pipe runs at slope. Stack invert is . Find start invert.
Step-by-Step Solution
0 of 2 Steps CompletedExample
Intermediate Example: Vent Stacks A dashed line connects a trap to a vertical pipe going through the roof.
Step-by-Step Solution
0 of 2 Steps CompletedExample
Advanced Example: Water Supply Fixture Units (WSFU) A bathroom has a flush valve WC (10 WSFU), a lavatory (2 WSFU), and a shower (2 WSFU).
Step-by-Step Solution
0 of 2 Steps CompletedElectrical Plans (E-Series)
Example
Basic Example: Wiring Layouts 3 lights connected by solid lines, a dashed line with an arrow, and a switch .
Step-by-Step Solution
0 of 3 Steps CompletedExample
Intermediate Example: Panel Schedules A circuit is labeled 20A, 1-pole. The load is at .
Step-by-Step Solution
0 of 2 Steps CompletedExample
Advanced Example: Voltage Drop A 120V circuit runs to a load. Max allowable drop is .
Step-by-Step Solution
0 of 2 Steps CompletedMechanical Plans (M-Series)
Example
Basic Example: HVAC Airflow A main duct is . Velocity is . Find ().
Step-by-Step Solution
0 of 2 Steps CompletedExample
Intermediate Example: Duct Reductions A duct reduces from to after a branch takeoff.
Step-by-Step Solution
0 of 2 Steps CompletedExample
Advanced Example: Return Air Plenums No return ducts are drawn in an office with a drop ceiling.